2. Toilet renovation, including the leveling of the threshold

This job necessitated the dismantling of sanitary fixtures and removal of the old terracotta/floor tiles. A new screed layer was poured and smoothed and then new tiles were laid. Unfortunately, the hiding of the additional plumbing outlet was not desired… Please note that the floor is clean and undamaged following work requiring the disposal of rubble. :)
 
toiletverbouwing tegels zetten tegels leggen betegelen   
         
toiletverbouwing loodgieterswerken badkamer aanpassingen verbouwen van het toilet  

JAREK ONDERHOUNDSBEDRIJF
© 2011 - Professional Interior Renovations
Mobile: +31 624 734 624
E-mail: alleklusseninhuis@gmail.com
webdesign - Pro-Link

- Installatie
- Renovatie
- Verbouw

- home
- diensten
- gallery
- partners
- contact
- waarom jarek stuk?